ELECRAFT KAF2 Betriebsanweisung Seite 10

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 35
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 9
- 7 -
Δ
Do not install jumper wires R18 and R19 on the back of the
board. Instead, install connectors J1 and J2 on the front as follows.
[ ]
Install a 5-pin female jack* on the top / component side at J1. It
must be seated flush on the board and be standing perpendicular to it.
Solder the center pin only.
[ ]
Similarly, install a 3-pin female jack* at J2, again only soldering
the center pin.
[ ]
Inspect both jacks to ensure they are seated flush against the board
and standing perpendicular to it.
[ ]
Solder the remaining pins of both jacks.
*
These connectors are provided with the Elecraft
®
KAF2 and KDSP2
options or the Rework EliminatorAux Filter Jacks kit.
KAT2
KBT2
KPA100
KAF2
KDSP2
KNB2
K160RX
K60XV
KSB2
Multiple
REWRK-FREE K2 ASSEMBLY
The K2 manual is the intellectual property of Elecraft, Inc, copyright © 1999-2012, all rights reserved, used with permission.
Seitenansicht 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 34 35

Kommentare zu diesen Handbüchern

Keine Kommentare